Road Project Update: Road surface pulverizing and final grading will be completed on Thu 9/17.  The picture taken from W1097 Kiel Rd shows the full road width after final grading.     The double culvert visible on the left was installed to channel westbound stormwater flows that previously backed up at the bottom of the hill causing stormwater to flow over Kiel Rd and flood crops on the south side of the roadway.   Paving of 5+ miles of Town of Calumet road surfaces will begin Friday, 9/18, weather permitting.   Paving is expected to last from 5 to 10 business days.

TEST TW WEATHER

Weather in your area

DayMinMaxSummary
Wed, 23 Sep 54°F 80°F Clear throughout the day.
Thu, 24 Sep 56°F 72°F Rain starting in the afternoon.
Fri, 25 Sep 60°F 79°F Clear throughout the day.
Sat, 26 Sep 62°F 76°F Overcast throughout the day.
Sun, 27 Sep 53°F 72°F Mostly cloudy throughout the day.
Mon, 28 Sep 47°F 64°F Light rain in the evening and overnight.
Tue, 29 Sep 48°F 62°F Possible light rain until evening.
Wed, 30 Sep 39°F 54°F Overcast throughout the day.