2021 Road Construction Update

2021 Road Construction Projects are to be completed by 10/11/21 (weather permitting).  Summary of actvitiy below:

Roads pulverized & repaved:

1.  Kiel Road: Corner @ CTH W replaced to make a 90 degree turn; Repaved from CTH W to end of new pavement from 2020 project (5,400 feet)

2.  South Townhall Road:  Repaved from CTH HHH to Brothertown boundary (700 feet)

Culverts replaced: Three (3)  Kiel Road (CTH W to St Paul Road)

Ditches reshaped to keep stormwater off town roads: Ten (10): Kiel, St Paul, Townhall Roads