Road Project Update: Road surface pulverizing and final grading will be completed on Thu 9/17.  The picture taken from W1097 Kiel Rd shows the full road width after final grading.     The double culvert visible on the left was installed to channel westbound stormwater flows that previously backed up at the bottom of the hill causing stormwater to flow over Kiel Rd and flood crops on the south side of the roadway.   Paving of 5+ miles of Town of Calumet road surfaces will begin Friday, 9/18, weather permitting.   Paving is expected to last from 5 to 10 business days.

TEST TW WEATHER

November 22, 2019 Budget Hearing

Notice is hereby given that on Friday November 22, 2019 6:00 p.m. at the Town of Calumet Town Hall, W2104 County Road HH Malone WI 53049 a PUBLIC HEARING on the proposed 2020 BUDGET for the Town of Calumet will be held. The detailed proposed budget is available for inspection at the Town Hall by appointment. Call Chairman Don Breth at 847-867-6306 to schedule an appointment. Residents and taxpayers may be heard regarding the budget and related matters as presented.